Permits, engineering and design of the SOWISE+ Flagship Plant

Duration Months 1–15
WP1 establishes the regulatory, technical and safety foundations required to construct the SOWISE+ Flagship Plant. The work includes obtaining the necessary construction and operating permits, carrying out site-specific environmental assessments and preparing the End-of-Waste dossier for PHBV produced from urban biowaste. The consortium will complete the basic and detailed engineering of the integrated facility, defining process flows, equipment specifications, plant layouts, piping, instrumentation, utilities and control systems. Safety analyses will identify operational risks and establish the appropriate prevention and protection measures. The engineering activities will cover both principal value chains: PHBV production from urban biowaste and the purification of cellulose recovered from post-consumer absorbent hygiene products. By the end of WP1, the project will have the complete technical documentation needed for procurement, installation, construction and commissioning of the flagship facility.